Skip To Main Content
Account
Settings
Logout
  • placeholder
Account
Settings
Logout
Filter:
Submit Search
Kitsap County logo
2021 Kitsap County Stormwater Design Manual
2021 Kitsap County
Stormwater Design Manual
You are here:

Volume I — Project Minimum Requirements and Site Planning

Chapters

Figures

Figure I-2.1. Example Map Documenting Existing Hydrologic Features.

Figure I-2.2. Example Composite Site Map.

Figure I-3.1. Example Determination of New and Replaced Hard Surfaces.

Figure I-4.1. Flow Chart for Determining Minimum Requirements for New Development Projects.

Figure I-4.2. Flow Chart for Determining Minimum Requirements for Redevelopment Projects.

Figure I-4.3. Flow Chart for Determining MR #5 Requirements.

Photos

Photo 1. Bioretention BMP in a LID Residential Neighborhood.

Photo 2. Example of a Shallow Gradient Slope.

Photo 3. Temporary Sand Bags Divert Construction Site Stormwater.

Photo 4. Sand Bags Prevent Silt-Laden Flow.

Tables

Table I-4.1. Minimum Requirements (MR) Summary.

Table I-4.2. On-site Stormwater Management Requirements (MR #5) for Large Projects.a,b

Table I-4.3. The List Approach for Minimum Requirement #5 Compliance.

Menu

Search

Go to the downloads page Downloads

Related Topics

Volumes and Chapters