9.3.3 Inspections

DCD shall be called for minimum inspection as follows and additional inspections may be required:

  1. After erosion and sedimentation control best management practices (BMPs) are in place and prior to the commencement of grading operations.

  2. After rough grading is completed.

  3. For final inspection, following site stabilization.