Submittal Requirements
A Site Assessment and Planning Packet (See Volume II, Chapter 1 and Appendix C) must be completed to document the assessment of key project components and site design considerations discussed above in this chapter. The packet consists of the following elements, each of which must be completed by the applicant and submitted as part of permit review:
- Project Information – Includes basic project summary information.
- Existing Site Inventory and Analysis Checklist – Documents findings from the inventory and analysis as described in Vol I–2.1 Inventory and Analysis of Key Project Components.
- Existing Site Composite Map
- Existing and Proposed Site Land Cover Areas – Summarizes existing and proposed site land cover areas. This summary information helps demonstrate compliance with the requirement to minimize impervious area, loss of vegetation, and stormwater runoff.
- Proposed Site LID BMP Matrix – Documents LID BMP infeasibility evaluation and provides justification for why individual LID BMPs were included or not included in site plans.
Volume II, Chapter 1 provides more detailed discussion of the permit review process and Appendix C includes a printable copy of the Site Assessment and Planning Packet.