For context for this table, refer to Vol II–5.3.2 Determine Infiltration Feasibility, particularly Step 3: Conduct Infiltration Testing.

Table II-5.5. Minimum Measured Infiltration Rates.

Infiltration BMP

Minimum Measured Infiltration Rate for List Approach (in/hr)

Minimum Allowed Measured Infiltration Rate for Meeting Flow Control, Runoff Treatment, and LID Performance Standards (in/hr)

Infiltration Trenches

5

5

Drywells

5

5

Bioretention without underdrain

0.3

0.3

Bioretention with underdrain

0.3

No minimum

Rain Gardens

0.3

Not applicable
(only for On-Site List Approach)

Permeable Pavement

0.3

0.3

Perforated Stub-out Connections

0.3

Not applicable
(only for On-Site List Approach)

Infiltration Basins

Not applicable

0.6

Infiltration Chambers

Not applicable

0.6